Zhejiang province to increase peak and valley price gap to reach 0.82 CNY/kWh

Zhejiang province to increase peak and valley price gap to reach 0.82 CNY/kWh

Zhejiang DRC released a document on “further improving the time-of-use electricity pricing policy”.

Jiangsu province released its 14th Five-Year-Plan (FYP ) for offshore wind with 9.09 GW

Jiangsu province released its 14th Five-Year-Plan (FYP ) for offshore wind with 9.09 GW

Jiangsu DRC recently released the "Second Public Announcement of the Environmental Impact Assessment of Jiangsu's "14th FYP" Offshore Wind Power Planning".

The first batch of Huaneng Shandong Bandao south 4# offshore wind farm connected to the grid

The first batch of Huaneng Shandong Bandao south 4# offshore wind farm connected to the grid

The first batch of Huaneng Shandong Bandao south 4# offshore wind farm was connected to the grid.

More than 12GW wind and solar guaranteed grid-connection projects selected in Hebei

More than 12GW wind and solar guaranteed grid-connection projects selected in Hebei

The province's guaranteed wind and solar grid-connected projects for 2021 have been published.

More than 12GW wind and solar guaranteed grid-connection projects selected in Hebei (2)

More than 12GW wind and solar guaranteed grid-connection projects selected in Hebei (2)

On September 17, the launching ceremony of the manufacturing of the H210-10MW offshore wind turbine of China Shipbuilding Corporation Haizhuang Wind Power (CSSC) was held in Zhuanghe, Dalian.

NEA releases pumped-storage hydro plan: targets 120 GW capacity by 2030

NEA releases pumped-storage hydro plan: targets 120 GW capacity by 2030

NEA releases pumped-storage hydro plan: targets 120 GW capacity by 2030

Subcategories