The CGN Shengsi 5#&6# Offshore Wind Farm has successfully connected its first batch of turbines to the grid.
At a time when the market is in high anticipation of China’s new action plan to meet the carbon emission target set by President Xi Jinping, the Ministry of Ecology and Environment (MEE) has announced two major policies that will take effect by New Year’s Eve, marking a new start of China’s carbon emission control action.
Recently, the Jiangsu Provincial Energy Bureau issued a draft for comments of the "14th Five-Year Plan" for renewable energy development in Jiangsu Province (hereafter referred to as the Draft).
On December 30, the 5MW distributed power generation market-oriented trading pilot project in Zhenglu Industrial Park in the city of Changzhou was successfully connected to the grid for power generation.
V2G (Vehicle to Grid) charging piles in Beijing have joined cross-provincial peak shaving of the North China, Shanxi and West IMAR power grids.
The CGN Zhejiang Daishan 4# Offshore Wind Farm belonging to CGN has successfully connected all turbines onto the grid.