South Hebei Power Grid’s new energy installed capacity surpasses 10GW

South Hebei Power Grid’s new energy installed capacity surpasses 10GW

79

To date, total new energy installed on the South Hebei Power Grid reaches 10GW, of which 2.64GW is attributable to Wind power and 7.36GW to Solar.

Since 2017, South Hebei Power Grid has ushered in an era of rapid development in new energy, gradually leading the transition away from traditional thermal power supply. This 10GW of new energy is expected to generate 13TWh of electricity per year, which would meet the annual electricity demand of 6.77 million households. (NEA)