Welcome to Azure International

Azure International is a leading investment and advisory company focused on China's cleantech energy sector. Founded in 2003, we have a team of 20+ local and international professionals based in China with backgrounds in engineering, marketing, manufacturing, consulting, policy, government relations and finance. In addition to deep advisory capabilities in renewable energy, energy efficiency, carbon management, and energy finance, we have proven capability to invest in and accelerate the development of clean energy companies.  Our portfolio and partner companies have achieved both significant commercial success and returns to investors. Azure provides the necessary expertise and execution capabilities in China to lead relationship development with government and strategic partners, project execution, sourcing, sales and technology development – all with deep understanding of Chinese and international requirements.

Contact Info

For further enquiries or if you are interested to

learn more about how we can collaborate, please

contact us directly at:

Azure International

Tel: +86 10 8447 7053

Fax: +86 10 8447 7058

E-mail: info@azure-international.com

News Summary:

  • NDRC determines on-grid price for third generation nuclear power technology
  • NDRC approves transmission price of Guangdong project in Northwestern Yunnan
  • SPIC releases final 6GW subsidy free onshore wind project WTG bidding results
  • CGN completes trial of 1,200-ton self-elevating offshore wind turbine installation platform
  • Beijing-Tianjin-Tangshan power grid absorbs 33.3TWh of local clean energy in 2018

 

 

NDRC determines on-grid price for third generation nuclear power technology

In 2013, the National Development and Reform Commission (NDRC), Zhejiang DRC, Shangdong DRC and Guangdong DRC issued a notice that supports the introduction of technology to the first batch of nuclear power units in the provinces. Last week, in conjunction with the provinces’ support for the first three generations (AP1000) of nuclear power projects, the following trial prices of on-grid tariffs have been determined:

  1. Guangdong Taishan Phase I Nuclear Power Project: 0.4350 CNY/kWh
  2. Zhejiang Sanmen Phase I Nuclear Power Project: 0.4203 CNY/kWh
  3. Shandong Haiyang Phase I Nuclear Power Project: 0.4151 CNY/kWh
    (NDRC)

AzureChinaCleantechNews08Apr2019 01

Note:The FITs will be put into effect from the projects’ start date until the end of 2021.

 

 

NDRC approves transmission price of Guangdong project in Northwestern Yunnan

The transmission price of the DC project in Northwestern Yunnan has been approved at 0.092 CNY/kWh (including tax without line loss); the transmission price of the supporting AC project in Yunnan Province is 0.015 CNY/kWh. The transmission price is determined by income generated from CAPEX, which ultimately depends on the span of distance of the project. (NDRC)

AzureChinaCleantechNews08Apr2019 02

The starting point of the project is located in Dali Prefecture, Yunnan Province. The line runs through Yunnan, Guizhou, Guangxi and Guangdong Provinces, with its endpoint located in Shenzhen, Guangdong Province. With a total length of 1,928 kilometers, it is the longest transmission project of the Southern Power Grid. The project relies on a ±800 kV DC transmission technology with a transmission capacity of 5GW.

 

 

SPIC releases final 6GW subsidy free onshore wind project WTG bidding results

Following the close of the recent bidding (refer to Azure’s earlier publication for more details on the bidding process) for SPIC’s 6GW subsidy free onshore wind project, the final results have been released last week: the project site will be located in Siziwangqi, Wulanchabu City, Inner Mongolia Autonomous Region (IMAR), it will require a total investment of 42.544 billion CNY, occupy a planned area of 3,800 square kilometers and reach a construction scale of 6GW. (BJX)

AzureChinaCleantechNews08Apr2019 03

 

 

CGN completes trial of 1,200-ton self-elevating offshore wind turbine installation platform

This platform is currently the most advanced of wind power installation platforms in China, classified by the China Classification Society (CCS) as a 7MW and below offshore wind turbine installation. It has a total length of 94.5 meters, width of 43.3 meters and depth of 7.6 meters, a design draft of 4.7 meters, leg length of 91.5 meters and maximum working depth of 60 meters. (BJX)

 AzureChinaCleantechNews08Apr2019 04

 

 

Beijing-Tianjin-Tangshan power grid absorbs 33.3TWh of local clean energy in 2018

In 2018, total electricity consumption in the Beijing-Tianjin-Tangshan region totaled 372.9TWh, a year-on-year (YOY) increase of 6.33%. Of that total consumption, on-grid electricity produced by local clean energy constituted 33.3TWh, a YOY increase of 13.8%. (BJ-PX)

AzureChinaCleantechNews08Apr2019 05


SUBSCRIBE TO CLEANTECH NEWS

* indicates required

Email Format

 

{{#image}}
{{/image}}
{{text}} {{subtext}}